top of page

How does the floor system work ?

- Each DWTT FutureFit ™ floor cassette incorporates engineered timber, open web Longreach™ floor joists combined with 18mm OSB sheet flooring.
- These cassettes use strongback LVL beams as stiffeners and include a patented and certified lifting brackets for ease of onsite crane installation.
Acoustic and thermal insulation can also be incorporated during manufacture.

DWTT-panelised-top-black-red.png

75 Weerong Rd Drouin, VIC 3818

Tel: (03) 5625 2537 

email: info@dwtt.com.au

Please send quote inquiries to quotes@dwtt.com.au

  • LinkedIn
  • Black Instagram Icon

© 2024 Drouin West Timber & Truss Pty Ltd FutureFit ™

ftmasig - no background.png
Hia Logo.png
Vertical Member RGB.png
bottom of page